Popular on Rezul


Similar on Rezul

Chip seal pavement maintenance scheduled for multiple Columbia streets beginning July 8

Rezul News/10707233
(COLUMBIA, MO) ~ Columbia, MO - The City of Columbia Public Works street crews will be starting their chip seal pavement maintenance project on Tuesday, July 8. This project aims to extend the life of existing asphalt and improve the overall condition of the city's streets. The work is expected to continue until the end of July, weather permitting.

According to Public Works officials, chip sealing is a common method used for pavement preservation. It involves spraying a thin layer of heated asphalt emulsion on the roadway, followed by a layer of small stone chips. These chips are then pressed into the surface using heavy rollers. This process not only provides improved traction for drivers but also helps protect the underlying pavement from water intrusion and oxidation.

The maintenance work will take place from Monday to Thursday, between 7 a.m. and 7 p.m. Residents are advised to avoid parking on the streets listed below during these times as orange 'No Parking' signs will be placed at least 24 hours in advance. Vehicles parked in work zones during active hours may be subject to towing.

More on Rezul News
The City of Columbia Public Works has released a list of streets that will undergo chip seal pavement maintenance:

- Defoe Drive from Faurot Drive to Scott Boulevard

- Brewer Drive from Defoe Drive to West Rollins Road

- Summit Road from Walther Court to South Fairview Road

- Laurel Drive from Summit Road to South Fairview Road

- West Gillespie Bridge Road from Chapel Hill Road to Scott Boulevard

- Oak Cliff Drive from Chapel Hill Road to the south end of the street

- Katy Lane from Forum Boulevard to Limerick Lane

- Misty Glen from Katy Lane to Valley Vista Drive

- Westwinds Drive from West Boulevard South to the west end of the street

- Prairie Lane from North Creasy Springs Road to concrete section near West Prairieview Drive

- West Prairieview Drive from North Creasy Springs Road to Prairie Lane

- Blue Ridge Road from North Garth Avenue to Piranha Court

- Grace Ellen Drive from Oakland Gravel Road to Oakland Gravel Road

- Parker Street from Vandiver Drive to the north end of the street

- Lovejoy Lane from Deer Run Court to Grace Ellen Drive

More on Rezul News
- Lovejoy Lane from Blue Ridge Road to Deer Run Drive

- Whitegate Drive from Paris Road to Sylvan Lane

- Hathman Place from Paris Road to Business Loop 70 East

- Topsail Drive from Parker Street to Grand Banks Drive

- Burlington Street from Heriford Road to Vandiver Drive

- Sylvan Lane from Vandiver Drive to Clark Lane

- Towne Drive from Whitegate Drive to Clark Lane

- Calvert Drive from Nelwood Drive to the end of the street

- Thompson Road from North Wyatt Lane to Creve Coeur Drive

- Thornwood Drive from Thompson Road to Beechwood Drive

- Beechwood Drive from Thornwood Drive to Thompson Road

- Nelwood Drive from Paris Road to Quail Drive

- Spring Cress Drive from Mexico Gravel Road to Pineland Drive

- Fern Flower Court from Spring Cress Drive to the end of the street

- Royal Aberdeen Street from Glen Eagle Drive to Killarney Drive

- Killarney Drive from Royal Aberdeen Street to the east end of the street

- Stonehaven Road from Highlands Parkway to the end of the street

- Highlands Parkway from Highlands Court to Glencairn Drive

- Stirling Court f

Filed Under: Government, City

Show All News | Report Violation

0 Comments

Latest on Rezul News